News
January 2021 year
Fifth line of the Amur Gas Processing Plant sees installation of process equipment
The reflux tank was installed in the low-temperature gas separation unit. PSA unit was installed on the third helium unit.
Majority of residents of Svobodny and Svobodnensky district positively assess the construction of the Amur Gas Processing Plant
According to the results of the survey, it was noted that 80% of residents of Svobodny and Svobodnensky district have a more or less positive attitude to construction of the large gas processing enterprise.