News
June 2019 year
Assembly of storage tanks for products begins at the Amur Gas Processing Plant
The volume of each tank is 2,400 cubic meters, which is four times higher than the parameters traditionally used in industry (600 cubic meters).
First graduates in Gazprom class
Graduation party of school No. 1 in Svobodny was held in Lazo recreation center. 77 students received their matriculation certificates, including 25 students of the first Gazprom class in the Amur Region.
Gazprom Pererabotka Blagoveshchensk LLC employees joined the community cleanup campaign in Svobodny
A landing party of more than fifty people cleared the beach and the surroundings of the Shestyanka Lake in the linear section of Svobodny. Several trucks with of plastic, glass, cans and bottles, dead wood and other garbage were taken from the territory of the destination popular among Svobodny residents.
Navigation open in 2019: the first large-sized equipment of the season was delivered to the jetty of the Amur GPP
The first vessel with large-sized equipment in 2019 arrived on the Zeya river to the temporary jetty of the Amur Gas Processing Plant. The vessel delivered six filter separators weighing more than 46 tons each to the plant.